Carbonated and still products can place different demands on a packaging project. Define the product range, containers and cleaning plan before comparing candidate lines.
- Which still and carbonated products must the line handle?
- What product changeover and cleaning arrangements can be demonstrated?
Plan product changes across the installation
Map product supply, cleaning connections and supporting equipment to the destination layout. Clarify what is included in the offer and what remains a site project. Agree how planned product transitions will be evaluated during commissioning.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.