Give the plant utility specialist a common demand basis before comparing several lines on one CO₂ header. Collect the controlled operating data and published requirements for each connected machine. Confirm which lines start together and what other consumers already share the service.
Document the simultaneous demand
Use the supplier’s units and specified conditions. When they share the same mass basis, an illustrative 12 kg/h and 8 kg/h occurring together total 20 kg/h before other demand. Have the responsible engineer assess the actual distribution, operating requirements and safety provisions.
| Scenario | Demand basis | Confirmed by site or supplier |
|---|---|---|
| Line A alone | Product, rate and demand | ___ |
| Line B alone | Product, rate and demand | ___ |
| Both active | Simultaneous demand and time | ___ |
| Other header uses | Connected services and operating window | ___ |